SD Projects
Pressure Zone Improvements
Sioux Falls, SD
Contract: $1,240,941.00
Completed: June 2011
Owner: City of Sioux Falls, SD
Engineer: Howard R Green Company, Sioux Falls, SD
Scope: Replacement of 2 vertical turbine can style pumps, relocating existing piping, fittings, and valves. Install new piping, fittings and valves. Related concrete, masonry, excavation, backfilling site piping, electrical and mechanical systems. Plant Capacity will be upgraded by 8.4 MGD.
Tea Harrisburg Meter Building
Tea - Harrisburg, SD
Contract: $593,190.00
Completed: September 2008
Owner: Lewis and Clark Water System, Sioux Falls, SD
Scope: Construct two masonry meter buildings with piping, appurtenances, and telemetry to supply water to the communities of Tea and Harrisburg
TM Rural Water District
Dolton, SD
15,000 Sq. Ft. Water Treatment Plant – 4 MGD capacity. Cast in place/ Pre-cast Concrete construction
Lime softening/ Carbon Dioxide/ On-Site Chlorine generation/ Solids Contact Clarifier/ Gravity Filtration
750,000 gallon cast in place ground storage reservoir
Wastewater Treatment Facility
Phase IIA Improvements
Aberdeen, SD
Setting Precast Walls
Contract: $1,186,600.00
Completion: January, 2008
Scope: Expansion of existing Wastewater Treatment Plant consisting of erection of a precast building to house soda ash feed equipment complete with indoor storage silo and associated process, monitoring, and control equipment.
Big Sioux Community Water System
500,000 Gallon Clearwell Addition Project
Egan, SD
Setting Wall Gang Forms
Contract: $734,000.00
Completion: September 2007
Scope: Construction of 500,000 gallon below grade clearwell with associated system tie-ins
Water Reclamation Facility
Process Pump Station
Transfer Pump Modifications
Sioux Falls, SD
Contract: $1,015,151.78
Completion: April 2009
Scope: Replacement of (4) transfer pumps, 30” suction piping, and valves; modify and expand existing concrete wetwell; reroute existing 24” and 48” site piping
|
|